多功能核相仪
Multifunction nuclearphase
l概述Outline
北京飞举电气有限公司生产的FJHXY-1型多功能核相仪,采用电子信息检测技术和无线传输技术,操作安全可靠,使用方便,克服了有线核相仪器的诸多缺点,运用多种信号源的组合使用方式,核相仪效率更高,核相距离远可达10公里。
Beijing Feiju electrical theLimited production FJHXY-1 multi-functional nuclear phase meter,using the latest electronic detection technology and wirelesstransmission technology, safe and reliable operation, easy to use,to overcome the many shortcomings Cable nuclear phase instrument,the use of a variety of signalsource used in combination, efficientnuclear phase the nuclear phase distances of up to 10km.
l设备功能Devicefunctions
多功能核相仪通过仪器面板上的旋转开关通过转动操作,可以工作在四种模式。
模式一:本地无线核相工作方式,在此工作方式下,只需一台核相仪即可实现核相功能,见图1。
模式二:远程无线核相接收工作方式,此工作方式需要两台核相仪配合使用,一台处于远程无线核相接收工作方式与一台处于远程无线核相发射工作方式配合使用,见图2及图4。
模式三:本地有线核相工作方式,在此工作方式下,只需一台核相仪即可实现核相功能,见图3。
模式四:远程无线核相发射工作方式,此工作方式需要两台核相仪配合使用,一台处于远程无线核相发射工作方式与另一台处于远程无线核相接收工作方式配合使用,见图4及图2。
The multifunctional nuclear phaseoperation by turning the rotary switch on the instrument panel, youcan operate in four modes.
Mode 1: local wireless nuclear phase work, in thiswork, only one nuclear phase meter can be realized nuclear phasefunction, as shown in Figure 1.
Mode 2: Remote wireless nuclear receiving this workrequires two nuclear phase meter used in conjunction with a work inremote wireless nuclear receiving in a remote wireless nuclearphase transmission work with the use of, as shown in Figure 2andFigure 4.
Mode 3: thelocal wireline nuclear phase work, in this work, only one nuclearphase can be achieved nuclear phase function, as shown in Figure3.
Mode: wirelessremote nuclear launch, this way of working requires two nuclearphase used in conjunction with, one is in the remote wirelessnuclear phase transmission work with another station is the remotewireless nuclear receiving work with the use, as shown in Figure4and Figure 2.
核相仪工作模式示意图
Nuclear phase modediagram
l设备作用及应用Role andapplication of equipment
多功能核相仪(FJHXY-1)适用于50赫兹交流电源的核相工作。
作用:1)相位校验应用场合:1)同一电源的联络线连接
2)相序校验2)不同电源的并网连接
3)附带验电功能3)电缆架空线路验收
The multifunctional nuclear phase(FJHXY-1) applies to the nuclear phase of the 50 Hz ACpower.
Effects: 1)PhasechecksumApplications: 1) the contact line of the same powerconnection
2) phase sequencecheck2) different power grid connection
3) with the electricalinspection3) Cable overhead lines acceptance